5% Discount lifting concrete 35t double girder motor-driven overhead bridge crane

fem 3m overhead crane, fem 3m overhead crane Suppliers and ...

b'Alibaba.com offers 1,829 fem 3m overhead crane products. A wide variety of fem 3m overhead crane options are available to you, such as warranty of core components, local service location, and \xe2\x80\xa6'

Weihua Crane Precast Concrete Bridge Girder Lifting Gantry ...

b'WEIHUA,Precast Concrete Bridge Girder Lifting Gantry Crane Made in China,professional produces best quality and good price gantry cranes to oversea buyers.'

Girder Crane - Double Girder Bridge Cranes Manufacturer ...

b'Hoist Travelling Speed. 20-25 m/min, >25 m/min, 15-20 m/min. We Vikrant Equipments is a manufacturer and supplier of Double Girder Cranes. Specifications: Double Girder Overhead Cranes Capacity: Up to 100 Ton. Span: Up to 30 meters. Long travel speed: Up to 40 meter/min. Cross travel speed: Up to 20 meter/min. LT Wheel:'

Overhead crane drawing: Double girder overhead crane ...

b'Sep 29, 2016 \xc2\xb7 Download 5 ton double girder overhead crane PDF Drawing: 5 ton double girder overhead crane drawing. Notes: The overhead crane drawings are just for reference, not the actual production drawings. If you need design drawings that suit your working condition, please send capacity, lifting'

Top Running Overhead Crane | Overhead Crane Sales | Aicrane

b'Crane running speed. 3-30m/min. Work duty. A5. Features of double girder top running crane: 1. The typical load capacity of double girder top running overhead crane ranges from 5 tons to over 400 tons. 2. It more often utilizes a top running trolley and hoist.'

Subaru EJ207 Engine - australiancar.reviews

b"Subaru's EJ207 engine was a 2.0-litre horizontally-opposed and turbocharged four-cylinder engine. For Australia, the EJ207 was first offered in the Subaru GC Impreza WRX STi in 1999 and subsequently powered the Subaru GD Impreza WRX STi. A member of Subaru\xe2\x80\x99s Phase II EJ engine family, key features of the EJ207 engine included its:"

Section I

b'Lot 1 5 T-Clamp for bus bar to bus bar connection Lot 1 6 T-Clamp for bus to feeder, transformer, Isolator and other switchyard equipment connections Lot 1 7 Galvanized iron perforated tray with side coupler plate bolts, nuts, washers and clamp etc. of sizes 150x25x2mm, 100x25x2mm and 75x25x2mm Lot 1 8'

b.e. | Supply Chain Management | Optical Fiber

b'A Two Span plate girder bridge is to be provided across a river having the following data: Flood discharge 100 m3/sec Bed width 30 m Side slope 1:1 Bed level 50.00 m HFL 52.50 m Maximum allowable afflux 15 cm. Calculate the span of the bridge. [6] Explain the following Terms: [4 2 \xe2\x80\xa6'